Industrial Manufacturing License & Factory Setup
For investors looking to establish factories, assembly lines, or heavy industrial operations. Unlock massive government incentives under the National Industrial Strategy.
Customs Exemption
0% Duty on imported machinery and raw materials required for your industrial operations.
Land Allocation
Direct access to industrial cities (MODON/RCJY) at highly subsidized long-term lease rates.
SIDF Financing
Soft loans covering up to 50-75% of total project costs with flexible repayment tenures.
Industrial Ecosystem
The Industrial License is tailored for manufacturing entities. It not only grants the right to manufacture but also provides access to the "Industrial Ecosystem," unlocking support from multiple government bodies to ensure factory success.
Regulatory Authorities:
- Ministry of Industry (MIM): The primary regulator for industrial permits and strategy.
- MISA: Issues the overarching investment license for foreign capital.
- NCEC: Issues mandatory environmental compliance and safety permits.
- MODON: Manages industrial land allocation and utility connections.
Common Challenges
- Environmental Compliance: Strict regulations on waste and emissions must be met and audited before operations.
- Capital Intensity: Requires significant upfront investment in machinery and infrastructure compared to service firms.
- Approvals Timeline: Securing land and environmental permits typically takes between 3 to 6 months.
- Technical Study: Requirement for a detailed feasibility study and technical proposal for MIM approval.
The Manufacturing Roadmap
From feasibility study to production start
Feasibility Study
Prepare a technical and economic feasibility study for the project.
MISA License
Obtain the primary MISA Industrial Investment License for the entity.
Environmental
Apply for and secure the initial environmental permit from NCEC.
Commercial (CR)
Register the company and obtain the Commercial Registration from MoC.
MIM Permit
Obtain the initial technical industrial license from the Ministry of Industry.
Land Allocation
Apply for land or factory space in industrial cities via MODON.
Construction
Commence factory construction and import clearing for machinery.
Production Start
Finalize the operational license and commence commercial production.